Skip to content

Project: Reconstruction of an existing and construction of a new road network in SWPR (2019)

Project Status

Start Date

Realisation Date

TYPE OF FUNDING

BUDGET (DENARS)

1. Coordination and management of the project (for the Municipality of Centar Zupa, M. Brod, Vevcani and Ohrid)
2. Selection of consultants for technical specification and evaluation of the bids
3. Conducted two tender procedures
4. Selection of supervisory bodies
5. Reconstruction of an existing road in n.m. Cereals in the length of 1.4 km
6. Completed reconstruction of the existing road st. Dimitar Vlahov in M. Ship in the length of 141.2 km
7. Performed new traffic solutions in Vevcani in the length of 630 m
8. Reconstruction of Kosta Abrash street and constructed Tabana square with an area of ​​500 m2
9. Prepared and submitted temporary and final documentation to BRR and municipalities partner in the project

  Final Report from the project

Gallery

Partner municipalities: 
Documentation 

Share this project

Share on email
Email
Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on whatsapp
WhatsApp
Share on telegram
Telegram