1. Coordination and management of the project (for the Municipality of Centar Zupa, M. Brod, Vevcani and Ohrid)
2. Selection of consultants for technical specification and evaluation of the bids
3. Conducted two tender procedures
3. Conducted two tender procedures
4. Selection of supervisory bodies
5. Reconstruction of an existing road in n.m. Cereals in the length of 1.4 km
6. Completed reconstruction of the existing road st. Dimitar Vlahov in M. Ship in the length of 141.2 km
7. Performed new traffic solutions in Vevcani in the length of 630 m
8. Reconstruction of Kosta Abrash street and constructed Tabana square with an area of 500 m2
9. Prepared and submitted temporary and final documentation to BRR and municipalities partner in the project