Project objectives General objective: The main objective (project intention) of the project is to improve the energy efficiency of existing public municipal facilities of regional significance and reduce the annual costs for heating and cooling, through the adoption of energy efficient measures and the construction of photovoltaic systems for the production of electric energy. Specific goals Higher strategic goals that are achieved by the realization of this regional project are the following interconnected goals:
- Reducing environmental pollution and raising the energy efficiency of public buildings through the realization of several investment activities in 7 municipalities related to energy efficiency and production of electricity from renewable energy sources.
- Reduction of the emission of polluting substances (particles, CO2, SO2, NOx) as CO2 equivalent from the combustion of fossil fuels (EL Oil for burning and firewood) through measures to improve the energy efficiency of 13 public buildings and electricity production from RES.
Results
- Reduced costs of public facilities
- Produced electricity from RES
- Reduced air pollution
- Improved environmental protection