Skip to content

Construction of wastewater collectors from Radozda to Kalista in the Municipality of Struga, the system for solving the problem of wastewater from Gradiste to St. Naum in the Municipality of Ohrid

Project Status

Realized projects

Start Date

Realisation Date

TYPE OF FUNDING

BUDGET (DENARS)

Short description
The Center for development through mutual cooperation with the Municipality of Struga and the engaged economic operator worked on collecting the necessary documentation for the preparation of the Basic design and the Infrastructure design for solving the problem with wastewater on the move from n.m. Kalishta to n.m. Radozda, Struga. Namely, on this part of Lake Ohrid, the so-called “western elector” that should cover the wastewater from these settlements and take them to the main treatment plant in Vranishta.
The project envisages construction of collectors in the length of 5.2 km, 4 pumping stations and accompanying equipment. The project was presented to relevant representatives of the EU Delegation in Skopje and the Ministry of environment and physical planning in order to find opportunities for its implementation. The project is funded through a performance-based grant scheme implemented by the GIZ RED Program and the Swiss Agency for Development and Cooperation.

Results
-Updated geodetic bases;
– Geo-mechanical elaborate;
– Urban planning documentation;
– Line infrastructure project;
– Basic design for primary collectors;
– Revision of a line infrastructure project;
– Revision of the basic project for primary collectors.

Gallery

Partner municipalities: 
Documentation 

Share this project

Share on email
Email
Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on whatsapp
WhatsApp
Share on telegram
Telegram