Skip to content

Project: Construction of EE objects (2019)

Project Status

Start Date

Realisation Date

TYPE OF FUNDING

BUDGET (DENARS)

Municipality of Struga – Execution of works for reconstruction of the kindergarten “8 March” – Struga

– replacement of old dilapidated carpentry (windows) – 2 doors and 35 windows; window panes and planks 77.46m; construction of thermal facade 450 m2; making plinth 45 m2; making and mounting horizontal and vertical gutters (horizontal = 145m, vertical = 38m); replacement of damaged roof structure 395 m2; stone installation on the entire roof 684 m2; procurement of new tiles 158 m2; procurement and installation of sheet metal for eaves and canopies 66.70m2; installation of laminated sheet metal on a roof structure 30m2.

Municipality of Debar – Reconstruction of the roof of a sports hall in the primary school Penestia – Debar

– replacement of damaged roof structure 162.66 m2; dashboard 650.67 m2; installation of wooden staffs 1346.00 m2; waterproofing 667.11 m2; thermal insulation of stone wool – 500.62 m2; installation of laminated sheet metal 667.11 m2; installation of horizontal and vertical gutters 187.6 m2; procurement and installation of FE ZN tape 61.78 m2. Municipality of Ohrid – Execution of works for reconstruction of windows and doors in the primary school “St. Kliment Ohridski” -Ohrid – Procurement of new PVC windows-109 pieces; windows with door-3 pieces; Adaptation of spaces in two new classrooms; Installation of Albanians made of plasticized sheet metal-308m; window covering-718m; Procurement and installation of board- 143m;

Municipality of Debrca – Execution of works for reconstruction of the primary school in the village of Meseista- Debrca

– procurement of new windows and doors made of PVC 12; Smoothing and painting the walls 1165 m2; making a floor slab 57.46 m2; partition walls 76.5 m2; suspended ceilings 55.22; insulation of ceilings 305m2; mounted heating system; electrical installation, sewerage.

Municipality of Vevchani – Reconstruction of windows and doors in the House of culture

– replacement of old dilapidated carpentry (window and doors) c- procurement and installation of new doors 6 pieces; procurement and installation of new windows 63 pieces; covering of railings on the inside 88 m; siding on the outside 88m;

Municipality of Centar Zupa – Execution of the project for the old administrative building of the Municipality of Centar Zupa

– procurement and installation of interior doors 9 pieces; procurement and installation of PVC windows 23 pieces; supply and installation of external PVC doors 2 pieces; plastering of interior walls 448 m2; construction of demit facade 624 m2; construction of a roof structure 174.4 m2; installation of wooden slats 1250 m; laying the roof structure of plasticized sheet metal 284 m2; electrical installation works;

Municipality of Kichevo – Execution of the project for kindergarten “Olga Miceska” -Kichevo

– replacement of old dilapidated carpentry (windows and doors) – procurement and installation of new doors 8 pieces; procurement and installation of doors with a window 12 pieces; procurement and installation of new windows 39 pieces; installation of immigrants from the outside 143.7 m; installation inside the PVC 141.2m.

Final report of the project

Gallery

Partner municipalities: 
Documentation 

Share this project

Share on email
Email
Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on whatsapp
WhatsApp
Share on telegram
Telegram