Skip to content

Final report – Project: Preparation of technical documentation for road infrastructure in SWPR (2018)

Project Status

Realized projects

Start Date

Realisation Date

TYPE OF FUNDING

BUDGET (DENARS)

Within this project, the following basic projects for reconstruction of the road infrastructure and atmospheric waters in SWPR have been realized:

  1. Basic project for reconstruction of a local road from the village. Trebenishta to the village Misleshevo (leg 1 and leg 2);
  2. Basic project for reconstruction of a local road from the village. Mesheishta to the monastery of St. Ilija (leg 1 and leg 2);
  3. Basic project for reconstruction of a local road from the village of Meseista to the village of Volino;
  4. Basic project for reconstruction of a local road in the village of Zlesti;
  5. Basic project for construction of a local road from Kichevo (settlement Bicini), v. Mamudovci to v.Strelci;
  6. Basic project for reconstruction and expansion of a local road from the village Strelci to village Sutovo.
  7. Basic project for construction of a collection street “S 2” from the street “Tourist” to the street “Partizanska”, Municipality of Struga;
  8. Basic project for reconstruction of the street “7th of November” in Ohrid
  9. Basic project for reconstruction of the street “Abas Emin” in city of Ohrid;
  10. Basic project for reconstruction and construction of streets: “Alopoj – Gogoj”, “Rusej-Vevchanski Izvori”, “Murcej-Drenje”, “Chitanoj 3”, “Kostojchini 3”, “Chezoj 1”, “Daskaloj 1”, municipality of Vevchani;
  11. Basic project for construction of storm sewer on the street in part UE 8 – Service street S2 with a length of 422m, Service street Se 2 length of 422m; Service street Se2 with a length of 810 m in city of Struga;

Gallery

Partner municipalities: 
Documentation 

Share this project

Share on email
Email
Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on whatsapp
WhatsApp
Share on telegram
Telegram