Skip to content

Category: Realized projects

Strengthening the capacities of PUCs through the procurement of equipment

Project Objectives Overall Objective: The main objective of the project is to improve the capacities of public utility companies in the Southwestern Planning Region through the procurement of equipment. The
Прочитајте повеќе

Strengthening the capacities of the PMU Kale-Centar Zupa through the procurement of equipment

Project Objectives Overall Objective: The main objective of the project is to improve the communal infrastructure through the procurement of a mini excavator for cleaning drainage channels, removing defects in
Прочитајте повеќе

Strengthening the capacities of the PUC Eremja-Vevchani through the procurement of equipment

Project Objectives Overall Objective: The main objective of the project through the procurement of the sewage cleaning machine is to improve the communal infrastructure and maintain the sewage network in
Прочитајте повеќе

Strengthening the capacities of PUC Debrca through the procurement of equipment

Project Objectives Overall Objective: The main objective of the project is to improve the municipal infrastructure and maintain the sewage network through the procurement of a sewage cleaning machine in
Прочитајте повеќе

Equipping a modern center for physical therapy in the hospital St. Erasmus

Прочитајте повеќе

Improved energy efficiency in public buildings and reduction of environmental pollution in JZPR (2021/2022)

Project objectives General objective: The main objective (project intention) of the project is to improve the energy efficiency of existing public municipal facilities of regional significance and reduce the annual
Прочитајте повеќе

Support of regional economic development through tourism, culture and other economic activities (2021/2022)

Project Objectives General Objective: The main project objective is to support regional economic development by improving tourism economic activity, culture in the Southwest Planning Region and other sectors of the
Прочитајте повеќе

Preparation of technical documentation and energy control for EE of public buildings (2020)

Within the project “Preparation of technical documentation and energy control for EE of public buildings” were prepared 11 Energy control reports and 12 technical projects with energy efficient measures. On
Прочитајте повеќе

Final report – Project: Preparation of technical documentation for road infrastructure in SWPR (2018)

Within this project, the following basic projects for reconstruction of the road infrastructure and atmospheric waters in SWPR have been realized: Basic project for reconstruction of a local road from
Прочитајте повеќе

Procurement and installation of public toilets in SWPR

Project goalsImproving the living conditions of tourists by installing modern sanitationequipment in the tourist centers in SWPR Project results– Procurement of 4 public toilets;– Installation of 4 public toilets;
Прочитајте повеќе